Dev Tools · 22h ago
How a false-positive bug report could destroy an auditor's credibility
A smart contract auditor nearly reported a critical overflow bug in a staking engine, but checking the actual constants revealed the overflow would take 2.3 × 10¹⁵ years to occur. The author emphasizes that avoiding false positives is crucial for maintaining trust, and that their scanner runs clean on all 248 OpenZeppelin source files. The lesson: verifying assumptions before reporting saves credibility and prevents wasted triage.
Meridian48 take
The piece underscores a persistent challenge in automated auditing: separating real vulnerabilities from noise, where a single false positive can erode trust in an entire report.
Read the full reporting
I almost reported a critical bug that didn't exist. One constant saved me. →
DEV Community
smart-contract-auditingfalse-positives